A lot of jobs done, soon it will start again.

    The defective tire from the trailer was repaired and replaced with the spare wheel.

    More SmartHome lighting installed in the playroom, um, trailer. Pictures will follow…

    A TV is permanently installed in the playroom.

    Laundry prepared for the winter.

    Many, many more jobs can be done.

    Stray was at the hairdresser’s.

    Checked the air pressure of the tires of the life vehicle.

      Categories:

      Tags:

      (Sweden) Actually, I wanted to start on Sunday. But that was an extremely rainy day. So warm afterwards that I didn’t enjoy reorganizing the whole playroom into a van. This morning it went quite well, very diligent. This afternoon again Extreme…. AT THE same time: Heavy […]
      (near Stockholm) From the beginning, I wanted to have either aluminum plates 3mm or plexiglass cut to size about 5 or 6 mm. Um, m² prices beyond 60€ were absolutely not worth it to me. Not even today. Performance (material) and consideration (€) just don’t fit […]
      (Europe) What do you do if the manufacturer or provider discontinues its servers or smart services? That’s right, a pretty stupid face. Especially for long-term assets. MERCEDES CANCELS ALL SMART EQ CONTROL Services. Of course, MB could have installed the small GSM boards (mobile network) in […]
      (Sweden and the World) Katrin wrote an interesting comment last night, which I would like to publish here. Your contribution to GERMAN ANGST makes me think. It’s an interesting experience. I have learned that this assessment also depends very much on perspective. In Chile, I have […]